I./SS-Pz.Rgt. 3 - Operational status 1944-1945

 

Operational status 1944-1945.

Key. Operational/Short term repair/Long term repair.

23.3.44.  10 Pz V
20.4.44.  7 Pz V/3
1.5.44 . 4 Pz V/1
15.544. 4 Pz V/1
1.6.44 . 3 Pz V/2
1.7.44. 6 Pz V/4
24.7.44. 7 Pz V
25.7.44. 10 Pz V at 06.35 am, at 07.25 am  5 Pz V, at 15.30 pm 42 Pz V.
26.7.44. At 06.50 am 35 Pz V, at 10.30 am  37 Pz V, ( 20 Pz V with VIII A.K )
27.7.44. 4 Pz V reported during the morning, at 14.35 hrs only 3 Pz V are reported operational.
28.7.44. 8 Pz V
29.7.44. 14 Pz V
30.7.44. 14 Pz V
31.7.44. 18 Pz V/23/6. ( 1 Kp with 10 Pz V attached to III/SS.Pz.Gr.Rgt 5 Totenkopf ).
1.8.44. 22 Pz V/30/5
2.8.44. 18 Pz V, later 19 Pz V are reported operational
3.8.44. 8 Pz V, later 21 Pz V are reported operational
4.8.44.  24 Pz V/25/8
5.8.44. 28 Pz V/18/6
6.8.44. 32 Pz V
7.8.44. 32 Pz V
8.8.44. 34 Pz V
9.8.44. 36 Pz V/15/2
10.8.44. 34 Pz V/18/2
11.8.44. 33 Pz V/20/2
12.8.44. 30 Pz V/23/2
13.8.44. 24 Pz V/30/3
14.8.44. 30 Pz V/24/3
15.8.44. 32 Pz V/22/3
16.8.44. 33 Pz V/21/3
17.8.44. 40 Pz V/14/3
18.8.44. 40 Pz V
19.8.44. 44 Pz V
20.8.44. 36 Pz V
21.8.44. 33 Pz V
23.8.44. 32 Pz V
24.8.44. 32 Pz V
25.8.44. 32 Pz V
26.8.44. 33 Pz V
27.8.44. 27 Pz V ( 3 Pz V from 1 Kp, attached to 5 SS-Pz.Div Wiking until 1.9.44  )
29.8.44. 23 Pz V
30.8.44. 21 Pz V
31.8.44. 26 Pz V
1.9.44. 20 Pz V/8/22
2.9.44 . 26 Pz V
3.9.44 . 31 Pz V
4.9.44 . 24 Pz V
6.9.44. 25 Pz V
7.9.44. 23 Pz V
9.9.44. 27 Pz V
10.9.44. 25 Pz V
11.9.44. 25 Pz V
12.9.44. 20 Pz V
13.9.44. 14 Pz V
14.9.44. 14 Pz V
15.9.44. 15 Pz V
16.9.44. 12 Pz V
17.9.44. 12 Pz V
18.9.44. 15 Pz V
19.9.44. 13 Pz V
20.9.44. 17 Pz V
21.9.44. 15 Pz V
22.9.44. 17 Pz V
23.9.44. 15 Pz V
24.9.44. 17 Pz V
25.9.44. 17 Pz V
26.9.44. 17 Pz V
27.9.44. 21 Pz V
28.9.44. 21 Pz V
30.9.44. 22 Pz V
1.10.44. 22 Pz V/8/6
2.10.44. 22 Pz V
3.10.44. 22 Pz V
4.10.44. 22 Pz V
5.10.44. 22 Pz V
6.10.44. 24 Pz V
7.10.44. 25 Pz V
8.10.44. 27 Pz V
9.10.44. 27 Pz V
10.10.44. 19 Pz V
11.10.44. 10 Pz V
12.10.44. 12 Pz V
13.10.44. 11 Pz V
14.10.44. 13 Pz V
15.10.44. 13 Pz V
16.10.44. 11 Pz V
17.10.44. 11 Pz V
18.10.44. 15 Pz V
19.10.44. 16 Pz V
20.10.44. 18 Pz V
21.10.44. 15 Pz V
22.10.44. 14 Pz V
23.10.44. 14 Pz V
24.10.44. 17 Pz V
25.10.44. 16 Pz V
26.10.44. 17 Pz V
27.10.44. 15 Pz V
28.10.44. 15 Pz V
29.10.44. 15 Pz V
30.10.44. 15 Pz V
31.10.44. 15 Pz V
1.11.44. 15 Pz V/12/2
2.11.44. 14 Pz V
3.11.44. 14 Pz V
4.11.44. 14 Pz V
5.11.44. 15 Pz V
6.11.44. 17 Pz V
7.11.44. 15 Pz V
8.11.44. 16 Pz V
9.11.44. 16 Pz V
10.11.44. 16 Pz V
11.11.44. 19 Pz V
12.11.44. 20 Pz V
13.11.44. 20 Pz V
14.11.44. 20 Pz V
15.11.44. 20 Pz V
16.11.44. 20 Pz V
17.11.44. 20 Pz V
18.11.44. 22 Pz V
19.11.44. 21 Pz V
20.11.44. 22 Pz V
21.11.44. 23 Pz V
22.11.44. 22 Pz V
23.11.44. 22 Pz V
24.11.44. 21 Pz V
27.11.44. 9 Pz V
1.12.44. 22 Pz V/5/2
2.12.44. 22 Pz V
3.12.44. 27 Pz V
4.12.44. 27 Pz V
5.12.44. 27 Pz V
6.12.44. 27 Pz V
7.12.44. 27 Pz V
8.12.44. 27 Pz V
9.12.44. 27 Pz V
10.12.44. 27 Pz V
11.12.44. 27 Pz V
12.12.44. 27 Pz V
17.12.44. 21 Pz V
22 12.44. 21 Pz V
30.12.44. 21 Pz V

1945.

1.1.45. 20 Pz V/7/2
2.1.45. 24 Pz V
3.1.45. 6 Pz V
5.1.45. 10 Pz V
6.1.45. 10 Pz V
7.1.45. 10 Pz V
11.1.45. 9 Pz V
13.1.45. 12 Pz V
15.1.45. 7 Pz V
16.1.45. 9 Pz V
17.1.45. 4 Pz V
19.1.45. 10 Pz V
20.1.45. 1 Pz V
21.1.45. 1 Pz V
22.1.45. 3 Pz V
23.1.45. 5 Pz V
24.1.45. 1 Pz V
25.1.45. 0 Pz V
26.1.45. 1 Pz V
27.1.45. 3 Pz V
30.1.45. 3 Pz V
1.2.45. 3 Pz V/11/3
2.2.45. 3 Pz V
3.2.45. 0 Pz V
5.2.45. 0 Pz V
7.2.45. 3 Pz V
10.2.45. 7 Pz V
12.2.45. 2 Pz V
13.2.45. 10 Pz V/5/1
15.2.45. 11 Pz V/3/2
17.2.45. 12 Pz V
18.2.45. 12 Pz V
19.2.45. 12 Pz V/2/2
20.2.45. 12 Pz V
21.2.45. 12 Pz V
24.2.45. 9 Pz V
26.2.45. 9 Pz V
28.2.45. 9 Pz V
1.3.45. 9 Pz V/5/2
2.3.45. 9 Pz V
3.3.45 . 9 Pz V
4.3.45. 9 Pz V/4/3
5.3.45. 9 Pz V/6/1
6.3.45. 5 Pz V
10.3.45. 8 Pz V
11.3.45. 8 Pz V/6/2
12.3.45. 8 Pz V
15.3.45. 8 Pz V/6/2
17.3.45. 8 Pz V
20.3.45. 0 Pz V
25.3.45. 0 Pz V
1.4.45. 0 Pz V/0/2
5.4.45. 0 Pz V
10.4.45. 0 Pz V/1
12.4.45. 1 Pz V
15.4.45. 1 Pz V/0/1
25.4.45. 2 Pz V.



FaLang translation system by Faboba